location
project sector
project owner
size
Located in Galliano, Louisiana, this project entailed the expansion and renovation of the Bristow Galliano Heliport.
The project consisted of an existing terminal renovation, a new terminal addition – that more than doubled its size to 28,552 SF, two new S-92 hanger additions (15,312 SF), two new storage buildings (10,150 SF), a baggage drop off pavilion (2,250 SF), open gable addition (840 SF), miscellaneous site demolition/concrete paving, an expansion of their existing North limestone parking lot, and a temporary terminal in operation during terminal construction.
our blog
Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing
LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project.
© LEMOINE. ALL RIGHTS RESERVED. | Privacy Policy | Terms & Conditions