location
project sector
project owner
size
Contracted by Tiger Athletic Foundation (TAF) and delivered under the CMAR approach, this $78 million, 290,000 SF project completed the expansion to the south end zone at Tiger Stadium in Baton Rouge. TAF, a seasoned builder of major collegiate sports facilities, chose the Lemoine/Brasfield & Gorrie team based on their advanced pre-construction process that confirmed that the project would meet the tightly defined budget constraints and the critical opening schedule.
Making it the second largest in the Southeastern Conference and fifth largest in the nation, the project included the addition of an upper deck to the south end zone, renovations to the existing structure and an expansion of the stadium by more than 6,000 seats including a 3,000 seat stadium club, 70 skybox suites and 1,500 upper deck seats.
The Expansion Project is a true success story for cost control during pre-construction, as the Lemoine/Brasfield & Gorrie pre-construction team was successful at driving the project cost down over 11% between Conceptual Design and Construction Documents. However, more impressive, we were able to deliver an additional 20 luxury suites and 225 club seats beyond the original concept.
our blog
Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing
LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project.
© LEMOINE. ALL RIGHTS RESERVED. | Privacy Policy | Terms & Conditions