our portfolio

Overton Brooks Central Energy Plant

Work with us

location

Shreveport, LA

project sector

Healthcare + Senior Living

project owner

Southland Energy

size

17,260

Construction of new 17,260 SF central energy center on the campus of the Overton Brooks VA Medical Center in Shreveport, LA. Project consists of new concrete tilt wall panels and steel structure, with concrete foundations, drilled piers, and TPO roofing system. Interior finishes are minimal. All exterior louvers are provided by Southland for installation by LEMOINE. Utilities, Plumbing, HVAC, Electrical, & Fire Protection scopes of work are by Southland under a separate contract.

our blog

Lemoine News

Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing

get started

Through every stage of your project, LEMOINE is ready to put our experience to work for you. Together, we can build a better world.

get started

50 years of construction experience, industry resources, and superior talent form the bedrock of the ONE LEMOINE philosophy. Our service lines deliberately connect to support the full building lifecycle, leveraging our expertise every step of the way.

LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project. 

© LEMOINE. ALL RIGHTS RESERVED.  |  Privacy Policy  |  Terms & Conditions